New insights from the court on the Defective Premises Act 1972
April 11, 2024
New insights from the court on the Defective Premises Act 1972April 11, 2024 There is likely to be increased interest in claims under the Defective Premises Act 1972 (DPA), following the extended limitation periods offered by the Building Safety Act 2022 (BSA). The DPA imposes duties on those taking on work “in connection with the provision of a dwelling” to use proper materials and to see that the dwelling is fit for habitation. The recent case of Vainker and another v Marbank Construction Ltd and Others1 is a revealing and much-needed insight into how the courts will interpret the DPA. BackgroundThe case was brought by a homeowner against its architect and contractor, in respect of a new build, known as The Croft at Walpole Gardens, Twickenham. It was intended to be the homeowners’ dream retirement property. The case was considered by Mrs Justice Jefford in the TCC. Key findings and reminders1. Limitation period runs from completion of the dwelling These proceedings commenced on 4 May 2020, before the extended limitation periods under the BSA came into effect. This meant that there was only a 6 year limitation period to make a claim under the DPA. Claims under contract and tort had expired, as the breaches occurred before practical completion on 15 May 2014. However, proceedings were not time-barred under the DPA, where the limitation runs from the date of completion of the dwelling. 2. No restriction or limitation of liability permitted The damage was caused by both the contractor and architect. Usually full recovery can be made against any party that contributed to the damage (regardless of how small their contribution is). This is reversed if the defaulting party has a net contribution clause in their contract, which limits liability to the proportion of damage that it actually caused. The architect had the benefit of a net contribution clause within the terms of its RIBA Architect’s Appointment and sought to rely upon this. However, this was rejected by the court, as it is not possible to limit liability for a DPA claim. The DPA states that, “Any term of an agreement which purports to exclude or restrict, or has the effect of excluding or restricting, the operation of any of the provisions of this Act, or any liability arising by virtue of this provision, shall be void” (s.6(3)). 3. What “fit for habitation” means in context
4. Remediation work required in a “professional manner” Although the inclusion of a handrail would have mitigated this risk and complied with Building Regulations, this was not a sufficient remedy. The judge decided that, “The damages should more naturally reflect the failure to see that the work was done in a professional manner”. It was therefore decided that replacing the glass in its entirety was a method of remediation that was more akin to the professional manner in which the works should have been carried out and more appropriate (even when the installation of the handrail would have rendered the works safe). Key takeaways1. as well as the extended limitation periods offered by the BSA, it is interesting to note how DPA claims can sometimes compare favourably to contractual and tortious claims, due to the potential for the limitation period to run from a later date (i.e. the date of completion rather than the date of breach) 2. this case is a useful reminder that it is not possible to contractually limit or exclude liability under the DPA 3. recent commentary on the DPA has led to it being associated with defects that are unsafe. However, the statutory provision that “work…done in a workmanlike…or professional manner.. so that…the dwelling will be fit for habitation” is a wider requirement and will be interpreted as such by the courts Latest Insights
Latest News
Latest Events
legal updates July 22, 2026 The comment deadline for the CFTC’s prediction markets proposal is approach... podcasts and webcasts July 21, 2026 Protecting tax data in the age of AI legal updates July 20, 2026 Industrials Unpacked #1: Supply Chain Contracts legal updates July 17, 2026 Ten recommendations, one clear signal: TTMF directs transatlantic regulatio... firm news July 20, 2026 Eversheds Sutherland Continues California Growth with Addition of Former US... client news July 20, 2026 Eversheds Sutherland Advises Teucrium As Sponsor for Y’all Street Physical ... client news July 16, 2026 Eversheds Sutherland advises Elda River in secured financing supporting exp... media mentions July 14, 2026 3 Int'l Arbitration Trends To Watch: Midyear Report virtual UAE - Employment law in the Dubai International Financial Centre September 10, 2026 9.30am - 1.30pm (GMT) Virtual in-person Managing AI use in the workplace: what every UK HR team needs to know September 10, 2026 9.30am - 1.00pm (BST) London, United Kingdom in-person Basic foundations of US employment law September 17, 2026 9.30am - 4.30pm (GMT) London, United Kingdom in-person 2026 BDC Roundtable September 23, 2026 Washington DC, United States |