Eversheds Sutherland Finland has advised SMA Altenso GmbH on the sale of the Alapitkä battery energy storage project (95 MW / 220 MWh) to Swiss investor re:cap global investors ag, acting on behalf of the FP Lux European Battery Storage fund.
Battery Park Alapitkä is a stand-alone, utility-scale BESS project developed by SMA Altenso together with Infinergies Finland Oy, with construction scheduled to begin in spring 2026 and operations targeted for 2027. The deal marks SMA Altenso’s entry into the Finnish market.
In addition to the sale, Eversheds Sutherland advised SMA Altenso GmbH on the full EPC delivery of the project. The assignment spanned multiple jurisdictions and legal disciplines — including corporate, real estate, construction, regulatory, and tax matters — and involved advisory throughout the project lifecycle, from development to investment and construction.
The assignment was led by Henrik Sandholm together with Henri Minkkinen, Juha Ilola, Sanni Tirkkonen, Linda Stenroth, Torsti Lakari, Jussi Aranne, Teemu Tomminen, Maria Anttonen, Arttu Liipo, Tuomas Capraro, Leena Pyymäki and Valtteri Välläri.
The materials on the Eversheds Sutherland website are for general information purposes only and do not constitute legal advice. While reasonable care is taken to ensure accuracy, the materials may not reflect the most current legal developments. Eversheds Sutherland disclaims liability for actions taken based on the materials. Always consult a qualified lawyer for specific legal matters. To view the full disclaimer, see our Terms and Conditions or Disclaimer section in the footer.